PROLOGIC LM Heavy Duty Long Leadclip w/pins & Tailrubber 10pcs - MatchFishing
0

Your Cart is Empty

Out of stock)

PROLOGIC LM Heavy Duty Long Leadclip w/pins & Tailrubber 10pcs

2467

⏳ Sale ends in {timer}

Heavy Duty Long Leadclip W/Pins & Tailrubber

A safe lead clip system for use with extremely heavy leads ideal for big river fishing

  • Designed to release the lead should it become snagged
  • For use with size 8 swivel
  • The metal arm reduces twist, releases easier and is stronger for bigger leads
  • Ref: 49889