Upišite svoju email adresu ukoliko želite primati novosti
You have %itemCount% in your cart.Total being %total%
SKU: 2467
Product Vendor Number: 49889
Procijenjeno vrijeme isporuke: 2-3 radna dana
Short Overview
The Prologic LM Heavy Duty Long Leadclip was developed for safe fishing with very heavy leads in demanding conditions. This long lead clip system is especially suitable for fishing in running waters, where rig reliability and controlled lead release are extremely important.
Description
When fishing on large rivers, in stronger current, or on snag-filled venues, you need a lead clip system that can handle heavier loads. The Prologic LM Heavy Duty Long Leadclip uses a robust construction with a metal arm that reduces rig tangles, increases strength, and allows easier lead release if it gets snagged. It is primarily intended for carp fishing and other situations where heavier leads and safety rigs are used.
Features
Technology
Specifications
Advantages
Note
The product is supplied in a pack of 10 pieces. For proper operation of the safety system, correct positioning of the tail rubber and checking the rig before fishing are recommended.