PROLOGIC LM Heavy Duty Long Leadclip w/pins & Tailrubber 10pcs

Prologic LM Heavy Duty Long Leadclip w/Pins & Tailrubber 10pcs

€4,77 €5,30 −10% OFF

Prologic LM Heavy Duty Long Leadclip w/Pins & Tailrubber 10pcs

€4,77 €5,30 −10% OFF

Prologic LM Heavy Duty Long Leadclip w/Pins & Tailrubber 10pcs

SKU: 2467

Product Vendor Number: 49889

€4,77 €5,30 −10% OFF
NONE LEFT IN STOCK

Procijenjeno vrijeme isporuke: 2-3 radna dana

OPIS PROIZVODA

Short Overview

The Prologic LM Heavy Duty Long Leadclip was developed for safe fishing with very heavy leads in demanding conditions. This long lead clip system is especially suitable for fishing in running waters, where rig reliability and controlled lead release are extremely important.

Description

When fishing on large rivers, in stronger current, or on snag-filled venues, you need a lead clip system that can handle heavier loads. The Prologic LM Heavy Duty Long Leadclip uses a robust construction with a metal arm that reduces rig tangles, increases strength, and allows easier lead release if it gets snagged. It is primarily intended for carp fishing and other situations where heavier leads and safety rigs are used.

Features

  • Long heavy duty lead clip system for very heavy leads
  • Safely releases the lead if it becomes snagged
  • Designed for use with size 8 swivels
  • The swivel can be locked and secured using a pin
  • Metal arm reduces rig tangles
  • Stronger construction for heavier loads and larger leads
  • Recommended for fishing in running waters and stronger current
  • Pack contains 10 pieces with pins and tail rubbers
  • Colour: green

Technology

  • Long lead clip construction for a more stable and secure rig
  • Metal arm for reduced risk of tangles and easier lead release
  • Swivel pin system for locking and securing size 8 swivels

Specifications

BrandPrologic
ModelLM Heavy Duty Long Leadclip w/Pins & Tailrubber
TypeLong lead clip system
PurposeVery heavy leads, fishing in running waters
CompatibilitySize 8 swivel
Safety functionLead release when snagged
ConstructionMetal arm for reduced tangles and greater strength
Swivel securingUsing a swivel pin
ColourGreen
Package contents10 lead clips, pins and tail rubbers
Product code49889

Advantages

  • Increases rig safety in demanding conditions
  • Reduces the risk of problems when the lead gets snagged in obstacles
  • Handles use with heavier leads better
  • Less rig tangling during fishing and presentation
  • An excellent choice for rivers, stronger current, and heavy carp rigs

Note

The product is supplied in a pack of 10 pieces. For proper operation of the safety system, correct positioning of the tail rubber and checking the rig before fishing are recommended.

Previous Product Next Product
Najpopularnije opcije plaćanja American Express Diners Club Visa Mastercard PayPal Shop Pay Apple Pay Google Pay Klarna